Cost Estimation and Quantity Surveying

HSR Stations Abu Dhabi

Execution project for the high-speed line connecting Abu Dhabi with Dubai. Pre-construction work for two stations: ADR (central station) and AUH (station integrated into the airport).
Measurement of earthworks, foundations, and structural elements for both stations.

Gerstaberg - The East Link

Participation in the execution project of a railway viaduct of approximately 1 km and an adjacent bridge.
Measurement of earthworks, foundations, and structural elements, both reinforced concrete and steel structures.

Sant Joan de Deu Hospital

Construction of an 8-level building: “Únicas SJD”, a monographic center for the treatment and research of rare diseases.
Collaboration during the design phase in preparing measurements of earthworks, concrete and steel structures, façade/envelope, and architecture.

A-9 Highway Extension

Widening of the A9 motorway over approximately 10.5 km.
Review of design documentation to compare measured data with current construction. Verification of all structure and earthwork quantities, both in design and updated versions, with detailed tracking by phase and element.

RSSOM Project

Execution of several maintenance buildings for the new 15.6 km railway line in Ontario.
Measurement of earthworks and structural works—both concrete and steel—of the three main buildings: OMSF (maintenance), Train Wash & MOW (train cleaning), and TPSS (electrical installations).

Sotra Link

Construction of a highway connecting Kolltveit with Bergen.
Measurement and verification of quantities based on executed models for all types of structures (bridges, drystone walls, retaining walls, and underpasses).
In total, more than 60 verified structures, including the iconic main 900 m suspension bridge.

Potomac River Tunnel

Execution of the Potomac River Tunnel (PRT), approximately 5.5 m in diameter with a maximum excavation diameter of 6.7 m, consisting of a 4 km northern section and a 5 km southern section.
Detailed measurement of the tunnel and eight major structures: the central launch shaft (WPP) and seven northern shafts, including excavation, support, and reinforced concrete structures.

Metro Grand Paris

Expansion of the metro and suburban railway network throughout the Greater Paris area.
Budget review before initiating the execution phase and technical analysis of the stations for certain extension lines.
Detailed study of material quantities, optimization strategies, and cost reduction analysis.

NEOM Trojena

Construction of a lake within the large NEOM project, including all its associated structures.
Comprehensive bid-phase measurement of all retaining and supporting structures for the lake and its annexes: embankment dam, concrete dam, tunnel to the inner island, adjoining footbridge, etc.

E18/E39 Gartnerlokka – Kolsdalen

Collaboration in the design and construction project of a new 1.4 km urban road section in Kristiansand, with two lanes per direction between Gartnerløkka and Kolsdalen.
Detailed measurement of 15 specific concrete and steel structures (bridges, underpasses, tunnels, etc.), walls, and demolition of existing structures.

Structural Design

Prefabricated Units, Roig Arena

Modelling and verification of prefabricated steel modules installed around the stadium. With a capacity of up to 20,000 spectators for large concerts, this venue is expected to attract one million visitors in its first year.
Modeling and verification of all modular elements.

Brafim WWTP

Design, sizing, and verification of concrete structures forming the Wastewater Treatment Plant: Biological Reactor, Secondary Settler, and Control Building.
Reinforcement calculation for reinforced concrete elements and preliminary sizing of precast concrete elements.

King Salman Park

Participation in the mega-project of the world’s largest urban park, covering over 16 square kilometers.
Design and structural calculation of precast vaulted tunnels for pedestrians and internal park transport systems. Coordination with other technical disciplines such as water flowing or mobility.

Kilombero Facilities Expansion

Design, sizing, and verification of a steel structure supporting the generation containers. The structure includes steel beams, grating walkways, stairs, and steel columns.
Design and calculation of reinforced concrete foundation slabs.
Review of construction drawings.

Precast Slabs for Transformer Centers

Modeling and verification of reinforced concrete prefabricated slabs used in transformer center buildings. Structural modeling and stress analysis performed with Autodesk ROBOT.
Technical input for compliance with Spanish and European standards.

Sciences Campus Café – University of Murcia

Modelling and calculation of the café structure, consisting of steel columns, beams, and purlins fixed to a reinforced concrete slab.
Structural modelling for stress analysis, profile optimization, and verification of element and connection strength.

Rod El Farag Bridge

Cable-stayed bridge with a central span of 300 m and a total length of 540 m. World record as the widest cable-stayed bridge (67.3 m).
Technical support focused on concept development and quality control of structural computational models. Creation of an RM Bridge model for verification of various structural aspects.

Nouvelle Route du Littoral Viaduct

Precast segmental viaduct over the sea with a total length of 5,400 m, divided in 7 equivalents viaducts.
Structural calculation during the execution phase of the precast segments.
Resistance analysis of the segments in all stages—from fabrication to installation—including storage, lifting, and placement.

Other Services

RUA Al Haram Master Plan

Design of railway tunnels and bridges forming part of the Master Plan for Mecca, planned to expand by 500,000 inhabitants in coming years.
Design and drafting of public transport routes together with the mobility team, followed by the conception of the required structures. Coordination with other disciplines.

I-66 As-Built Documentation Management

Modification of a 36 km section of the I-66 highway. Plans include earthworks, structures, stormwater drainage, culverts, and lighting.
Review of construction drawings and site annotations to determine necessary plan modifications, producing the final as-built drawings.

PM and ATDOCV AENA Airports Balearic Islands

Project Management and ATDOCV Technical Assistance for airports in the Balearic region. Formation of the French-Spanish joint venture, contract negotiation, and tender setup.
Coordination of the on-site team at Palma Airport as Project Managers for ongoing works.

RN19 Highway Diversion​

Diversion and undergrounding of the RN19 highway through Boissy-St-Léger (Paris region). Supervision and monitoring of works for the project consisting of a twin cut-and-cover tunnel nearly 1,000 m long.
Main tasks included quality assurance during execution and control of produced documentation.